电报群组大全(www.tg888.vip)_DNeX unit takes delivery of FPSO from Teekay

时间:2个月前   阅读:18

电报群组大全www.tg888.vip)是一个Telegram群组分享平台,飞机群组内容包括telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容,为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

PETALING JAYA: Dagang Nexchange Bhd’s (DNeX) subsidiary Ping Petroleum UK PLC has taken delivery of the Sevan Hummingbird floating production, storage and offloading (FPSO) vessel from marine energy transportation company, Teekay Corp.

DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

“We have a tangible asset ready with the newly acquired Sevan Hummingbird. Our next step is to secure approval for our field development plan, which will be submitted in the coming months,” he said yesterday.

Ping has received a “no objection” letter from the North Sea Transition Authority in March and was then granted a 19-month extension from the authority to the second term of the P2006 licence containing the Avalon field.

“The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external, low-carbon source,” DNeX said.

Ping is also evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility which will help minimise diesel usage and associated greenhouse gas emissions.

The planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the United Kingdom’s energy security and net-zero targets.

Commissioned in 2008, the Sevan Hummingbird FPSO is a 60 metre-diameter facility with a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.

With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Avalon, Ping’s second oilfield asset, is expected to come onstream in 2025.


转载说明:本文转载自Sunbet。

上一篇:Telegram分享群组(www.tel8.vip)_First same-sex couples get married in Switzerland

下一篇:澳洲幸运5开奖网(www.a55555.net)_Govt took interests of all parties into account before setting new chicken ceiling price, says Nanta

网友评论